Case study: LTE, Nuclear, Service & Support

Welding repair of fatigue crack in cast iron component

Description

Many says its impossible to repair, but life-time extensions, advanced welding repairs and refurbishment of cast iron equipment, cast-iron components, mining kilns, valves etc which is part of our customers production plants have been part of Uddcombs lfe time extension product portfolio for more than 30 years.  Various welding repair concepts have been developed for specific applications Welding repairs of cast-iron components have been executed worldwide.

Share:

Problem

Cast-iron components and equipment is common in many production plants worldwide. Many customers think that welding repairs of cast-iron components is impossible and that degraded components must be replaced with new components. New cast-iron components are often long lead items which can create major costs related to loss of production. Welding in cast-iron applications is very challenging and require extensive metallurgical, mechanical and welding engineering knowledge. In this application a 150mm thick cast-iron component suffered from a 80mm deep fatigue crack. The picture shows the weld joint preparation prior to weld repair. Delivery time of a new component was 15 months with major loss of production as a direct result of the break down.

Solution

Uddcomb resources have being providing advanced welding repairs of cast iron components of our customers components for 30 years with excellent results. Uddcomb have filler material and welding equipment on stock for various applications and we develop advanced welding repair concepts for new applications if needed. In this particular case a welding repair concept was developed in 24h. The repair was completed at site in 3 days.

Outcome

Advanced welding repairs of cast iron assets, components or equipment at our customers premises or in our own workshop can often eliminate the need for replacement. Extending the life of current cast-iron equipment will also limit major financial impact related to weeks or sometimes months of loss of production in valuable assets.